Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Event or temporary issue |
Tags: | None |
Date time: | 8.15am, Monday 5th March, 2007 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | kbrumann |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Klaas Brumann |
Area: | Cambridge |
"Roadworks at the top of the cycle ramp coming out of the Elizabeth Way / Newmarket Rd roundabout underpass going onto Elizabeth Way itself on the left hand side (by CRC)."
"The alternative route to the left side of Elizabeth Way involves crossing East Road (3 crossings), walking round the Grafton and then crossing Maid's Causeway." Or crossing Elizabeth bridge on the Eastern side towards St Andrews Street.
Comments reflect the views of the original submitter only.