Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | cambridge, peashill |
Date time: | 6.47pm, Monday 21st May, 2007 |
Time line: | Earlier | Later |
Facing: | South east |
Added by: | martin |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
Buildout presumably being created for the new cycle contraflow being created following pressure by the Campaign. Probably about the best position that could be achieved given bureaucratic restrictions by the DfT.
Comments reflect the views of the original submitter only.