Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Non-specific |
Tags: | None |
Date time: | 6.42pm, Monday 21st May, 2007 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | martin |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
Entrance to the new car parking. To the right is the new contraflow in Corn Exchange Street being built, but with a ludicrously large buildout which should instead have been used to widen the cycle path.
Comments reflect the views of the original submitter only.