Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: An example of good practice |
Tags: | None |
Date time: | 9.56am, Friday 21st April, 2000 |
Time line: | Earlier | Later |
Facing: | West |
Added by: | martin |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Clare Macrae |
'Hybrid' contraflow cycle track in Aarhus, Denmark. The path is on-road but there is a physical demarcation between the cycle lane and the carriageway.
Comments reflect the views of the original submitter only.