Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | None |
Date time: | 4.34pm, Saturday 3rd December, 2005 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | martin |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
Kerb needs to be made flush. The current poor construction results in cyclists just using the pavement to the right of the pole.
Comments reflect the views of the original submitter only.