Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | None |
Date time: | 11.19am, Sunday 7th January, 2007 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | kbrumann |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Klaas Brumann |
Area: | Cambridge |
Construction work to narrow Chesterton Road westwards at traffic lights between Hamilton Road and George Street is under way (pink line). This forces cyclists (coming from St Georges bridge) to cross the opposite lane at Hamilton Rd to go onto the widened pavement.
Comments reflect the views of the original submitter only.