Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | None |
Date time: | 8.17am, Monday 10th September, 2007 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | kbrumann |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Klaas Brumann |
Area: | Cambridge |
Chesterton Road, between Herbart Street and Hamilton Road. Cyclists crossing in that direction also experience five changes in surface material.
Comments reflect the views of the original submitter only.