Add to Gallery: | Add this photo to a Gallery |
Category: | A general photo.: An example of good practice |
Tags: | None |
Date time: | 9.00am, Sunday 16th September, 2007 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | davidhembrow |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | David Hembrow |
Cycle path in new housing estate. Full segregation where there is a 30 km/h speed limit on the road. Note that the cycle path is smoother, wider and more direct than the road and at crossings, drivers have to give way to cyclists.
The cycle path is four metres wide, the pavement is two metres wide.
Comments reflect the views of the original submitter only.