Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: An example of good practice |
Tags: | None |
Date time: | 9.12am, Sunday 16th September, 2007 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | davidhembrow |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | David Hembrow |
Emerging from a cycle underpass. Almost central in the image on the right of the path is parking for the bus stop (but no sign as it's being redone at present).
When I took this photo, I thought this path seemed perfectly smooth. There were a few imperfections but no pot-holes. So, you can imagine my surprise at seeing the surface replaced a few months later due to it being "rough": #12933
The cycle path is four metres wide. The pavement is 2.5 metres.
Comments reflect the views of the original submitter only.