Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: An example of good practice |
Tags: | None |
Date time: | 1.27pm, Monday 24th December, 2007 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | davidhembrow |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | David Hembrow |
Junction on four metre wide cycle paths in Assen just around the corner from the rubbish bin shown in #12353
As ever, they're wide, smooth, well sign-posted, kept clear of ice and leaves, actually go somewhere useful etc. etc.
Comments reflect the views of the original submitter only.