Category: | Cycleway: An example of good practice |
Tags: | None |
Date time: | 10.40am, Saturday 2nd February, 2008 |
Time line: | Earlier | Later |
Facing: | West |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Tim Burford |
Area: | Kingston upon Thames |
Kingston Bridge - rebuilt and widened in 2001 with a central bus lane and wide cycle lanes on both sides.
Comments reflect the views of the original submitter only.