I have now solved the mystery of why this path is narrower than the usual 4 metres and why it had its width written on it. The path was resurfaced a few days after this photo was taken. The width was written on to make sure the contractor didn't make it wider as this would have meant it crept onto private property.
Occasionally the council has to be pragmatic and can't keep to the normal 4 metre width for cycle paths.