Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | None |
Date time: | 9.00am, Tuesday 10th October, 2006 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | amassie |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | A Massie |
Area: | Cambridge |
At the entrance to Fair Street cyclists are directed over the pavement rather than a flush, street level entry
Comments reflect the views of the original submitter only.