Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | abbeyroad, cambridge, double-yellow, tree |
Date time: | 9.16am, Friday 8th May, 2009 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | amassie |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | A Massie |
Area: | Cambridge |
Cycle link needed through to proposed toucan crossing by removing the shrubs to the right of the tree.
The light column beyond also needs to be relocated.
Comments reflect the views of the original submitter only.