Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | cherryhintonroad, crossing, kerb, tactile, upstand |
Date time: | 2.46pm, Thursday 21st April, 2022 |
Time line: | Earlier | Later |
Facing: | South east |
Added by: | wookey |
Copyright: | Public domain |
Download: | View full-size original |
Credit: | Wookey |
Kerb upstand on eastern side of crossing is nowhere near flush. Upstand of 20-25mm is higher than my tyre.
Comments reflect the views of the original submitter only.