Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | channel, gutter, measurements, ramp, steps, stourbridge |
Date time: | 7.33pm, Wednesday 7th July, 2010 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | camcyclist9 |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
Stourbridge Common: open tread flight of eight steps & the cycle gutter.
Comments reflect the views of the original submitter only.