Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: An example of good practice |
Tags: | bridge, chisholm, cycleway, line, oldenburg, railway, trail |
Date time: | 1.20pm, Friday 15th March, 2013 |
Time line: | Earlier | Later |
Facing: | South east |
Added by: | kbrumann |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Klaas Brumann |
Waiting area for when the two sections of the railway bridge (with attached foot- and cycle bridge) swing up. See part of the mechanism to the right. A picture of the mechanism www.fotocommunity.de/pc/pc/display/22595519 . See also #48132.
Comments reflect the views of the original submitter only.