Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Event or temporary issue |
Tags: | 2013, cambridge, cycing, infrastructure, march, safari |
Date time: | 11.31am, Saturday 23rd March, 2013 |
Time line: | Earlier | Later |
Facing: | West |
Added by: | kbrumann |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Klaas Brumann |
Area: | Cambridge |
First Cambridge Cycling Infrastructure Safari stopping the bridge by the railway station. See also #48240.
Comments reflect the views of the original submitter only.