Add to Gallery: | Add this photo to a Gallery |
Category: | A general photo.: Other (infrastructure-related) |
Tags: | chisholm, cycleway, line, railway, trail |
Date time: | 10.36am, Sunday 21st April, 2013 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | kbrumann |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Klaas Brumann |
Area: | Cambridge |
This ready made lane for the Chisholm Trail runs from Clifton Road behind the removable barrier to the maintenance depot entrance at the end of Cavendish Road. See also #48768.
Comments reflect the views of the original submitter only.