Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | None |
Date time: | 3.35pm, Friday 28th June, 2013 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | davidearl |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | david@frankieandshadow.com |
Area: | Cambridge |
The start of the Tins path at the Cherry Hinton end, off Railway Street
Comments reflect the views of the original submitter only.