Add to Gallery: | Add this photo to a Gallery |
Category: | General road environment: Other (infrastructure-related) |
Tags: | asl, connect2, cycletrack, double-yellow, segregation, shareduse, trafficsignals |
Date time: | 7.24am, Saturday 6th July, 2013 |
Time line: | Earlier | Later |
Facing: | West |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
End of the dedicated cycle track, start of the shared-use footway, on Waterloo Street.
Comments reflect the views of the original submitter only.