Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: An example of good practice |
Tags: | bollards, connect2, cycletrack, giveway, priority, segregation |
Date time: | 7.23am, Saturday 6th July, 2013 |
Time line: | Earlier | Later |
Facing: | West |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
Priority for cycle track over garage entrance on Waterloo St Connect2 cycle track, shortly before launch. The triangle markings are interesting.
Comments reflect the views of the original submitter only.