Add to Gallery: | Add this photo to a Gallery |
Category: | A general photo.: Non-specific |
Tags: | None |
Date time: | 2.22pm, Saturday 16th November, 2013 |
Time line: | Earlier | Later |
Facing: | South east |
Added by: | hesterkw |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
This bank cannot be touched by the proposed segregated cycleway. It meets the level of Hobson's Conduits and provides seepage for it. It would be extremely expensive to reduce, and therefore cannot be used for space re-allocation.
Comments reflect the views of the original submitter only.