Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Event or temporary issue |
Tags: | bike, campaign, cycling, gilbert, junction, milton, road, stall |
Date time: | 8.40am, Thursday 13th February, 2014 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | kbrumann |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Klaas Brümann |
Area: | Cambridge |
Cambridge Cycling Campaign's stall bike at the Milton Road / Gilbert Road junction on Thu 13FEB2014 between 7:30 to 9am. The peak flow in the movement monitored was southbound cycling: 254 cyclists (of these 72% were in the main carriageway).
Videos: iitm.be/GilbMilt
Comments reflect the views of the original submitter only.