Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | wrexham |
Date time: | 8.48am, Thursday 13th February, 2014 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
Area: | Chirk |
The cycle track from Penygelli Primary School goes to the left - ahead there's no dropped kerb, so there shouldn't be a red surface (but the solid white line is accidentally correct).
Comments reflect the views of the original submitter only.