Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | balticstreet, clydegateway, conflict, crossing, eerr, line, toucan |
Date time: | 4.01pm, Saturday 14th June, 2014 |
Time line: | Earlier | Later |
Facing: | North east |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The cycleway has been designed without any thought about the potential for conflict between passing cyclists and crossing-users waiting at the toucan crossing. And the side road has a fence and kerb across it, hindering access to the crossing (see #59296).
Comments reflect the views of the original submitter only.